The Yankee Doodle Business Center is a 112,000-square-foot industrial bulk distribution center with three main entrance doors that provide access to the building, 15 truck doors, and two automatic drive doors. The building construction needed to meet the strict zoning requirements set by the state of Minnesota.
Project Details:
General Contractor
RJ Ryan Construction, Inc
Engineer of Record
Stroh Engineering
Architect
Lampert Architect
Fabcon Precast Panels Help Project Meet Rigorous Zoning and Design Requirements in Construction of New 112,000-Square-Foot Business Industrial Center
The Yankee Doodle Business Center, a 112,000-square-foot industrial, bulk distribution center was built with rigorous zoning requirements and consists of a faceted cast-in thin brick precast insulated wall panel façade. The 221 precast panels were selected for their durability, cost-effectiveness, functionality, and the ability to meet multiple architectural finishes required on the exterior.
Problem
State of Minnesota zoning requirements called for the exterior facade of the new business center to contain 65% Class A materials or materials that are non-combustible and are a minimum of one hour rated. What’s more, the city called for the building to fit into the existing neighborhood and look more like an office building than an industrial one.
Solution
The project used 221 total precast panels to help meet the design and zoning requirements as well as for their durability and cost effectiveness. The project team used exposed aggregate precast panels with horizontal and vertical articulation to accentuate the brick color, and precast panels clad with aluminum composite metal panels around the three primary building entrances. The 12-inch sandwich panels have an R-Value up to 28.2 which not only exceeded the required minimums per the code, but also provided a highly energy efficient building.
Results
The project team erected the insulated precast wall panels over ten working days, which not only allowed for a compressed construction schedule, but also provided a dry and heated environment for the team to finish the interior during the Minnesota winter. And by using precast wall panels and cast-in brick panels, the project saved as much as 30% compared to traditional exterior wall system construction methods.
What’s more, though it is classified as an industrial building, the city wanted it to look more like an office building. The brick exterior finish, and vertical and horizontal articulation, achieve this and make the building feel much smaller than it actually is.
”The Yankee Doodle Business Center is a 112,000 sq. ft. distribution center. Fabcon was selected to supply precast wall panels for their durability, cost effectiveness and functionality. Due to its location and build quality, The Yankee Doodle Center was pre-leased prior to the completion of its construction.