Forum is a first-of-its-kind mixed-use facility in the West Metro—west of Minneapolis—combining office space, conference rooms, a health club with saunas, golf simulators, and indoor pickleball courts. Developed by owner Adam Eskola, the project introduced a new business concept that required a building solution that was efficient, durable, and architecturally distinctive.
Project Details:
General Contractor
Bauer Design Build
Engineer of Record
Sandman Structural Engineers
Architect
Thielen & Green
Play. Work. Meet.
Forum was designed to house a completely new kind of mixed-use environment—part office, part health club—under a single roof. Precast concrete was selected early for its durability, height capability, and ability to deliver open, column-free interiors, while also meeting the tight construction timeline required to bring the business to market.
Problem
Precast concrete was the basis of design to meet the building’s durability, height, and performance needs. The second-story offices and tall pickleball courts required a structural system capable of reaching the necessary heights while maintaining open interior spaces.
Speed to market was critical, but Eskola’s biggest concern was how the vision would translate beyond drawings for a completely new type of mixed-use environment.
“One of my biggest concerns was how the design would translate from paper to reality,” said Eskola. “We designed a completely new kind of mixed-use space, and there were important design decisions that we had no other points of reference to know how they would feel in reality.”
Solution
Recognizing the advantages precast could bring to the project, general contractor Bauer Design Build brought Fabcon onto the team to deliver a fully integrated precast concrete solution tailored to Forum’s unique structural and architectural goals.
Insulated sandwich wall panels with an integrally colored exposed aggregate exterior formed the building envelope. Two panel colors created visual interest, while architectural metal panels wrapped the entry wing walls.
The load-bearing panels eliminated the need for perimeter steel columns, creating open, unobstructed spaces for the pickleball courts and recreation areas.
Inside, connection plates were recessed and patched, and panels were painted directly—eliminating drywall. The smooth finish matched traditional interiors while offering greater durability for a gymnasium environment.
Results
The precast system delivered measurable benefits in schedule, cost control, and long-term performance. Off-site fabrication and rapid installation allowed the exterior shell to be erected in less than a week, accelerating interior work and compressing the overall schedule.
“Walls were on the critical path,” Eskola noted. “Fabcon’s speed of manufacturing and installation was instrumental to our business opening only seven months after we put a shovel in the ground.”
That accelerated timeline allowed Forum to open in March, near the end of peak season for many of its offerings, bringing revenue online earlier.
Architecturally, the integrally finished panels eliminated additional exterior trades while delivering a durable appearance. Structurally, the load-bearing design maximized open court space without perimeter steel. Internally, finished precast walls reduced material costs and improved long-term durability—helping transform a bold concept into a successful new facility in the West Metro.
”One of the main driving forces behind the decision to use precast was construction timeline. I was blown away that the panels were fully installed in less than a week—and completely finished once installed.
Adam EskolaOwner